| Project Description: |
FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM EATON ROAD WEST TO FROST STREET
The project will consist of Phase 1 of the final phase of the Bruce Freeman Rail Trail that once complete will provide connectivity from Lowell to Framingham. Phase 1 proposes approximately 1.6 miles of shared use path with potential for boardwalk structures over critical environmental resource areas (assumed 500 LF). The trail corridor will intersect at grade with 2 roadways and crossing treatments will be evaluated.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Construction Begins: | Summer 2030 |
| Project Manager: | David Shedd![]() |
| Estimated Total Contract Cost: | $6,013,222.05 |
| Estimated Total Federal Participating Construction Cost: | $6,733,090.35 |
| Funding Provision: | This project is planned to be funded through the 2029 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
| District: | District 3 |
| Current Status: | 25% Package Received (as of 06/05/2026 ) |
|