Project Description: |
CAMBRIDGE- BRIDGE PRESERVATION, C-01-038, MEMORIAL DRIVE (EB) OVER CHARLES RIVER
This project will consist of bridge preservation work on the joints, deck, superstructure, and substructure of the Memorial Drive bridge over the Charles River, in the town of Cambridge.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2028 |
Project Manager: | Alyson Bedard |
Estimated Total Contract Cost: | $6,750,000.00 |
Estimated Total Federal Participating Construction Cost: | $7,000,000.00 |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|