Project Description: |
CAMBRIDGE- BRIDGE PRESERVATION, C-01-038, C-01-039 AND C-01-045, MEMORIAL DRIVE OVER CHARLES RIVER
This project will primarily consist of bridge preservation work on the substructure and superstructure beam ends for the bridge carrying Memorial Drive over the Charles River, in the city of Cambridge. Additionally work will include repairs to the parapets and railings, joint repairs, deck patching, and resurfacing to the westbound structure.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2028 |
Project Manager: | Alina Daragan |
Estimated Total Contract Cost: | $6,750,000.00 |
Estimated Total Federal Participating Construction Cost: | $7,000,000.00 |
Funding Provision: | This project is planned to be funded through the 2028 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|