ADAMS- RECONSTRUCTION OF HOWLAND AVENUE (ROUTE 8) AND LIME STREET
A "road-diet" is proposed for approx. one mile on Howland Avenue (municipally owned Route 8) in Adams. Proposed design consists of two travel lanes, a two-way-left-turn-lane (with some left-turn bays), and 5-ft shoulders from curb to curb. A buffered 10-ft shared use path is proposed on the west side of the highway and a buffered 6-ft sidewalk is proposed on the east side. Another design alternative, consisting of two 8-ft shared-use paths, is also being considered. Also included is approximately 2,100-ft of roadway rehabilitation and a new buffered shared use path on the north side of Lime Street to provide connectivity to the existing northern terminus of the Ashuwillticook Rail Trail.
Location:
  • Town of Adams
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Summer 2031
    Project Manager: Gregory Mischel
    Estimated Total Contract Cost: $17,049,350.00
    Estimated Total Federal Participating Construction Cost: $17,919,974.75
    Funding Provision: This project is planned to be funded through the 2031 Transportation Improvement Program for the Berkshire Metropolitan Planning Organization.
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2031
    Responsible MPO: Berkshire Metropolitan Planning Organization
    Location: Municipality
    Cities: ADAMS
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • AC 1 of 2; Total Project Cost = $20,787,171; YOE = 12%
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $8,344,316.00
    State Cost: $2,086,079.00
    Total Cost: $10,430,395.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/27/2023
    Project Need Form PNF Approved 11/15/2023
    Project Initiation Form PIF Entered 11/27/2023
    Project Initiation Form PIF Approved 11/20/2023
    Project Initiation Form PRC Submitted 12/06/2023
    Project Review Committee PRC Approved 12/14/2023
    Project Management