Project Description:
HATFIELD- NORTHAMPTON- BICYCLE AND PEDESTRIAN IMPROVEMENTS ON ROUTE 5/10, INCLUDES BRIDGE REPLACEMENT, H-11-007, WEST STREET (ROUTE 5/10) OVER GUTTER BROOK
The project will close pedestrian gaps by providing ADA / accessible sidewalks and ramps from the District 2 office to the northern limits (Waxing Café, 34 West St, West Hatfield, MA 01088). Enhanced crosswalks will be added to provide access to transit stops. The project wlll provide a Shared Use Path from the Big Y to Linseed Road, which may require curbline adjustments. The project may require culvert extensions at different locations. In addition, the intersection of Route 5 and Hatfield Street will be realigned, and the Running Gutter Creek culvert will be replaced and widened. In addition, the necessary cross section widening may require temporary and permanent strip taking of properties along the corridor; as well as some utilities relocation.
Location:
  • Town of Hatfield
  • City of Northampton
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Michael O'Dowd
    Estimated Total Contract Cost: $20,043,826.35
    Estimated Total Federal Participating Construction Cost: $20,588,401.40
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/27/2023
    Project Need Form PNF Approved 11/20/2023
    Project Initiation Form PIF Entered 11/27/2023
    Project Initiation Form PIF Entered 10/03/2024
    Project Initiation Form PIF Approved 11/22/2023
    Project Initiation Form PRC Submitted 04/29/2024
    Project Initiation Form PRC Submitted 10/03/2024
    Project Review Committee PRC Tabled 05/31/2024
    Project Review Committee PRC Approved 10/02/2024
    Project Management