| Project Description: |
DISTRICT 3- ACCESSIBILITY IMPROVEMENTS AT MULTIPLE LOCATIONS (SOUTHERN PROJECT)
The first location is in Worcester along Route 12 Hope Ave west of Evers St where two deficient pedestrian curb ramps will be reconstructed and upgraded to full ADA compliance. An additional four curb ramps are recommended to be constructed at this location. It is also recommended that 500 feet of sidewalk be constructed on the north side of the roadway and 2 Rapid Rectangular Flashing Beacons be installed at the two midblock crossings within the project limits.
The second location is in Worcester at the intersections of Blackstone River Road and Millbury Street and Blackstone River Road and Tobias Boland Way where two deficient pedestrian curb ramps will be reconstructed and upgraded to full ADA compliance. Pedestrian signal equipment should be upgraded to full ADA compliance at the crossing of Millbury St. It is also recommended that the curb ramps and pedestrian signal equipment be upgraded to full ADA compliance at the crosswalk across the Tobias Boland Way.
The third location is in Auburn at the intersection of Auburn St and Perry St where a deficient pedestrian curb ramp will be reconstructed and upgraded to full ADA compliance. It is also recommended that a reciprocal curb ramp be constructed on the south side of Auburn St and that the addition of an Rapid Rectangular Flashing Beacon is evaluated at the crossing. Additional traffic calming measures may be explored to slow vehicle speeds in advance of the crossing.
The fourth location is in Worcester at the intersection of Melrose St and Burncoat St were all deficient pedestrian curb ramps will be reconstructed and upgraded to full ADA compliance. In addition, it is recommended that four new curb ramps be constructed on the west side of the intersection with corresponding striped crosswalks and signal upgrades be made to accommodate fully accessible pedestrian signal equipment including at the unsignalized right turn slip lane.
|
| Location: | |
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2030 |
| Project Manager: | Dongke Yu![]() |
| Estimated Total Contract Cost: | $1,478,700.00 |
| Estimated Total Federal Participating Construction Cost: | $1,605,529.00 |
| Funding Provision: | This project is planned to be funded through the 2030 Transportation Improvement Program for the STATEWIDE. |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|