Project Description:
DISTRICT 3- ACCESSIBILITY IMPROVEMENTS AT MULTIPLE LOCATIONS (SOUTHERN PROJECT)
The first location is in Worcester along Route 12 Hope Ave west of Evers St where two deficient pedestrian curb ramps will be reconstructed and upgraded to full ADA compliance. An additional four curb ramps are recommended to be constructed at this location. It is also recommended that 500 feet of sidewalk be constructed on the north side of the roadway and 2 Rapid Rectangular Flashing Beacons be installed at the two midblock crossings within the project limits. The second location is in Worcester at the intersections of Blackstone River Road and Millbury Street and Blackstone River Road and Tobias Boland Way where two deficient pedestrian curb ramps will be reconstructed and upgraded to full ADA compliance. Pedestrian signal equipment should be upgraded to full ADA compliance at the crossing of Millbury St. It is also recommended that the curb ramps and pedestrian signal equipment be upgraded to full ADA compliance at the crosswalk across the Tobias Boland Way. The third location is in Auburn at the intersection of Auburn St and Perry St where a deficient pedestrian curb ramp will be reconstructed and upgraded to full ADA compliance. It is also recommended that a reciprocal curb ramp be constructed on the south side of Auburn St and that the addition of an Rapid Rectangular Flashing Beacon is evaluated at the crossing. Additional traffic calming measures may be explored to slow vehicle speeds in advance of the crossing. The fourth location is in Worcester at the intersection of Melrose St and Burncoat St were all deficient pedestrian curb ramps will be reconstructed and upgraded to full ADA compliance. In addition, it is recommended that four new curb ramps be constructed on the west side of the intersection with corresponding striped crosswalks and signal upgrades be made to accommodate fully accessible pedestrian signal equipment including at the unsignalized right turn slip lane.
Location:
Design Responsibility: Consultant
Right of Way Responsibility: MassDOT
Construction Begins: Summer 2030
Project Manager: Dongke Yu
Estimated Total Contract Cost: $1,478,700.00
Estimated Total Federal Participating Construction Cost: $1,605,529.00
Funding Provision: This project is planned to be funded through the 2030 Transportation Improvement Program for the STATEWIDE.
District: District 3
Current Status: This project is in the preliminary design phase.

Contracts (1) Progress
# 115769 -- Design -- Services
Statewide - Master Service Agreement for design and review services. Final

Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2030
    Responsible MPO: STATEWIDE
    Location: District
    Districts: District 3
    Category: Advertised Projects Constr.
    Budget Section: 2B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $1,438,553.60
    State Cost: $359,638.40
    Total Cost: $1,798,192.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/29/2023
    Project Need Form PNF Approved 11/29/2023
    Project Initiation Form PIF Entered 11/29/2023
    Project Initiation Form PIF Approved 11/29/2023
    Project Initiation Form PRC Submitted 12/01/2023
    Project Review Committee PRC Approved 12/14/2023
    Project Management