Project Description:
DISTRICT 3- ACCESSIBILITY IMPROVEMENTS AT MULTIPLE LOCATIONS (CENTRAL PROJECT)
The first location is in Marlborough at the intersection of Route 20 (E Main St) and Curtis Ave where all deficient pedestrian curb ramps will be reconstructed and upgraded to full ADA compliance. Additionally it is recommended to reconstruct the curb ramps on the northeast corner of the intersection, reconstruct the sidewalk on the pedestrian island, restripe crosswalks, and upgrade pedestrian signal equipment. The second location is in West Boylston on West Boylston St near Danielian Dr where two deficient pedestrian curb ramps will be reconstructed and upgraded to full ADA compliance. It is also recommended that sidewalk in poor condition on the west side of the road is reconstructed and the crosswalk across Danielian Dr is restriped. The third location is in Shrewsbury at the intersection of Route 9 and Lake St where a deficient pedestrian curb ramp will be reconstructed and upgraded to full ADA compliance. It is also recommended that a ramp on the southeast corner of the intersection is reconstructed, crosswalks are restriped and 250 feet of sidewalk constructed on the west side of Lake St south of the intersection. The fourth location is in Marlborough at the intersections of Pleasant St at Perry Ln and Pleasant St at Hunter Ave were two deficient pedestrian curb ramps will be reconstructed and upgraded to full ADA compliance. In addition it is recommended to reconstruct the reciprocal curb ramps, restripe crosswalks, and provide a crosswalk across Pleasant St at Hunter Ave with a new reciprocal curb ramp. At the new crossing the installation of an Rapid Rectangular Flashing Beacon should be evaluated.
Location:
Design Responsibility: Consultant
Right of Way Responsibility: MassDOT
Construction Begins: Summer 2029
Project Manager: Dongke Yu
Estimated Total Contract Cost: $1,227,600.00
Estimated Total Federal Participating Construction Cost: $1,378,278.00
Funding Provision: This project is planned to be funded through the 2029 Transportation Improvement Program for the STATEWIDE.
District: District 3
Current Status: This project is in the preliminary design phase.

Contracts (1) Progress
# 115769 -- Design -- Services
Statewide - Master Service Agreement for design and review services. Final

Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2029
    Responsible MPO: STATEWIDE
    Location: District
    Districts: District 3
    Category: Advertised Projects Constr.
    Budget Section: 2B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $1,190,832.00
    State Cost: $297,708.00
    Total Cost: $1,488,540.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/30/2023
    Project Need Form PNF Approved 11/30/2023
    Project Initiation Form PIF Entered 11/30/2023
    Project Initiation Form PIF Approved 11/30/2023
    Project Initiation Form PRC Submitted 12/01/2023
    Project Review Committee PRC Approved 12/14/2023