Project Description: |
SANDISFIELD- RESURFACING AND RELATED WORK ON ROUTE 8
The purpose of this project is to resurface travel-lanes and shoulders on State Highway Route 8 and replace signage and guardrail as needed.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Koby J Lemrise |
Estimated Total Contract Cost: | $5,566,506.17 |
Estimated Total Federal Participating Construction Cost: | $5,703,361.91 |
District: | District 1 |
Current Status: | 100% Package Received (as of 08/12/2024 ) |
|
Bridges |
|
|
|