| Project Description: |
SANDISFIELD- RESURFACING AND RELATED WORK ON ROUTE 8
The purpose of this project is to resurface travel-lanes and shoulders on State Highway Route 8 and replace signage and guardrail as needed.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Winter 2025/2026 |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $5,133,737.15 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project has been advertised for construction bids. (as of 11/08/2025 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||