Project Description: |
BOURNE- BRIDGE REPLACEMENT, B-17-004 (BOURNE BRIDGE) ROUTE 28 OVER THE CAPE COD CANAL, SANDWICH ROAD (ROUTE 6A) AND MCR/MBTA RR, B-17-019 (45L) ROUTE 28 OVER US 6 AND B-17-026 (457) ROUTE 28 ON/OFF RAMP OVER ROUTE 25 (CAPE COD BRIDGES PROGRAM PHASE II)
|
Location: |
|
Project Manager: | Bryan J Cordeiro |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|