Project Description: |
BROOKLINE- PEDESTRIAN BRIDGE REPLACEMENT, B-27-017, DAVIS PATH OVER MBTA
This project would replace the Davis Path Footbridge over the MBTA's Green Line D-Branch with a new ADA-accessible shared use facility.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Project Manager: | Harry Adolphe |
Estimated Total Contract Cost: | $12,668,590.00 |
Estimated Total Federal Participating Construction Cost: | $12,898,928.00 |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|