Project Description: |
DUDLEY- CULVERT REPLACEMENT ON ROUTE 131 (BETWEEN MM 7.2 AND MM 7.4)
The project aims to replace an undersized culvert to meet stream crossing standards to the maximum extent practicable. According to StreamStats, the tributary to the Quinebaug River is 7.5 feet. The existing culvert is only 36 inches.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Joseph Gyujong Yoo |
Estimated Total Contract Cost: | $2,107,500.00 |
Estimated Total Federal Participating Construction Cost: | $2,276,025.00 |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|