STATEWIDE- WIM STATION ENHANCEMENTS AND EXPANSION AT 16 LOCATIONS
Provisions to capture more data on Commercial Truck Traffic in particular Weigh in Motion (WIM) data collection sites was a key need flagged by FHWA. A total of 16 potential WIM station locations were identified based on interstates and major highways at state boundary and locations with high truck volumes and potential permit violations. One system design that is used throughout buildout of 16 locations will help to safeguard the use of consistent equipment and MassDOT Highway Divisions ability to operate and maintain the systems after they are constructed. The design of this technology project will follow FHWAs prescribed Systems Engineering Process (a ConOps, System Requirements, and then both a High Level and Detailed Design).
Location:
  • Town of Amesbury
  • City of Attleboro
  • Town of Bernardston
  • City of Fall River
  • Town of Longmeadow
  • City of Marlborough
  • Town of Methuen
  • Town of North Attleborough
  • Town of Salisbury
  • Town of Seekonk
  • Town of Sturbridge
  • Town of Tyngsborough
  • Town of Uxbridge
  • Town of Webster
  • Town of West Stockbridge
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Michelle Boucher
    Estimated Total Contract Cost: $17,201,200.00
    Estimated Total Federal Participating Construction Cost: $17,635,002.00
    District: District 1
    Current Status: 25% Package Approved (as of 12/20/2024 )

    Contracts (1) Progress
    # 115773 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 04/16/2024
    Project Need Form PNF Approved 03/26/2024
    Project Initiation Form PIF Entered 04/16/2024
    Project Initiation Form PIF Approved 03/26/2024
    Project Initiation Form PRC Submitted 04/19/2024
    Project Review Committee PRC Approved 05/15/2024
    Project Management
    25% Design 25% Package Received 11/15/2024