STATEWIDE- WEIGH IN MOTION STATION ENHANCEMENTS AND EXPANSION AT 15 LOCATIONS
Provisions to capture more data on Commercial Truck Traffic in particular Weigh in Motion (WIM) data collection sites was a key need flagged by FHWA. A total of 15 potential WIM station locations were identified based on interstates and major highways at state boundary and locations with high truck volumes and potential permit violations. One system design that is used throughout buildout of 15 locations will help to safeguard the use of consistent equipment and MassDOT Highway Divisions ability to operate and maintain the systems after they are constructed. The design of this technology project will follow FHWAs prescribed Systems Engineering Process (a ConOps, System Requirements, and then both a High Level and Detailed Design).
Location:
  • Town of Amesbury
  • City of Attleboro
  • Town of Bernardston
  • City of Fall River
  • Town of Longmeadow
  • City of Marlborough
  • Town of Methuen
  • Town of North Attleborough
  • Town of Salisbury
  • Town of Seekonk
  • Town of Sturbridge
  • Town of Tyngsborough
  • Town of Uxbridge
  • Town of Webster
  • Town of West Stockbridge
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Construction Begins: Winter 2025/2026
    Project Manager: Michelle Boucher
    Estimated Total Contract Cost: $23,743,898.63
    Estimated Total Federal Participating Construction Cost: $22,877,195.76
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the STATEWIDE.
    Current Status: This project has been advertised for construction bids. (as of 09/13/2025 )

    Contracts (1) Progress
    # 115773 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: STATEWIDE
    Location: Municipality
    Cities: AMESBURY
    ATTLEBORO
    BERNARDSTON
    FALL RIVER
    LONGMEADOW
    MARLBOROUGH
    METHUEN
    NORTH ATTLEBOROUGH
    SALISBURY
    SEEKONK
    STURBRIDGE
    TYNGSBOROUGH
    UXBRIDGE
    WEBSTER
    WEST STOCKBRIDGE
    Category: Advertised Projects Constr.
    Budget Section: 2B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Ntl. Freight Prgm (NFP) - Interstate
    Federal Cost: $8,550,000.00
    State Cost: $950,000.00
    Total Cost: $9,500,000.00

    Planned Federal FY: 2027
    Responsible MPO: STATEWIDE
    Location: Municipality
    Cities: AMESBURY
    ATTLEBORO
    BERNARDSTON
    FALL RIVER
    LONGMEADOW
    MARLBOROUGH
    METHUEN
    NORTH ATTLEBOROUGH
    SALISBURY
    SEEKONK
    STURBRIDGE
    TYNGSBOROUGH
    UXBRIDGE
    WEBSTER
    WEST STOCKBRIDGE
    Category: Advertised Projects Constr.
    Budget Section: 2B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Ntl. Freight Prgm (NFP) - Interstate
    Federal Cost: $11,174,940.90
    State Cost: $1,241,660.10
    Total Cost: $12,416,601.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 04/16/2024
    Project Need Form PNF Approved 03/26/2024
    Project Initiation Form PIF Entered 04/16/2024
    Project Initiation Form PIF Approved 03/26/2024
    Project Initiation Form PRC Submitted 04/19/2024
    Project Review Committee PRC Approved 05/15/2024
    Project Status Advertised 09/13/2025
    Project Management
    100% Design 100% Package Received 06/18/2025
    25% Design 25% Package Received 11/15/2024
    25% Design 25% Package Approved 12/20/2024
    75% Design 75% Package Received 03/14/2025
    Final Design PS&E Received 08/19/2025
    Final Design PS&E to FAPRO 09/05/2025