Project Description:
STATEWIDE- WEIGH IN MOTION STATION ENHANCEMENTS AND EXPANSION AT 15 LOCATIONS
Provisions to capture more data on Commercial Truck Traffic in particular Weigh in Motion (WIM) data collection sites was a key need flagged by FHWA. A total of 15 potential WIM station locations were identified based on interstates and major highways at state boundary and locations with high truck volumes and potential permit violations. One system design that is used throughout buildout of 15 locations will help to safeguard the use of consistent equipment and MassDOT Highway Divisions ability to operate and maintain the systems after they are constructed. The design of this technology project will follow FHWAs prescribed Systems Engineering Process (a ConOps, System Requirements, and then both a High Level and Detailed Design).
Location:
  • Town of Amesbury
  • City of Attleboro
  • Town of Bernardston
  • City of Fall River
  • Town of Longmeadow
  • City of Marlborough
  • Town of Methuen
  • Town of North Attleborough
  • Town of Salisbury
  • Town of Seekonk
  • Town of Sturbridge
  • Town of Tyngsborough
  • Town of Uxbridge
  • Town of Webster
  • Town of West Stockbridge
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Michelle Boucher
    Estimated Total Federal Participating Construction Cost: N/A
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the STATEWIDE.
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Planned Federal FY: 2026
    Responsible MPO: STATEWIDE
    Location: Municipality
    Cities: AMESBURY
    ATTLEBORO
    BERNARDSTON
    FALL RIVER
    LONGMEADOW
    MARLBOROUGH
    METHUEN
    NORTH ATTLEBOROUGH
    SALISBURY
    SEEKONK
    STURBRIDGE
    TYNGSBOROUGH
    UXBRIDGE
    WEBSTER
    WEST STOCKBRIDGE
    Category: Advertised Projects Constr.
    Budget Section: 2B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Ntl. Freight Prgm (NFP) - Interstate
    Federal Cost: $8,550,000.00
    State Cost: $950,000.00
    Total Cost: $9,500,000.00

    Planned Federal FY: 2027
    Responsible MPO: STATEWIDE
    Location: Municipality
    Cities: AMESBURY
    ATTLEBORO
    BERNARDSTON
    FALL RIVER
    LONGMEADOW
    MARLBOROUGH
    METHUEN
    NORTH ATTLEBOROUGH
    SALISBURY
    SEEKONK
    STURBRIDGE
    TYNGSBOROUGH
    UXBRIDGE
    WEBSTER
    WEST STOCKBRIDGE
    Category: Advertised Projects Constr.
    Budget Section: 2B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Ntl. Freight Prgm (NFP) - Interstate
    Federal Cost: $11,174,940.90
    State Cost: $1,241,660.10
    Total Cost: $12,416,601.00