Project Description: |
NORTH ATTLEBOROUGH- CULVERT REPLACEMENTS ON I-295 OVER THE TRIBUTARIES OF ABBOT RUN RIVER (DESIGN ONLY)
The purpose of this project is to replace 2 culverts to alleviate flooding on upstream side and minimize
scouring and erosion on the down stream side. The structures are deteriorating and the headwalls are falling apart. Replacing these structures would prevent impacts to I-295.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Hung Pham |
Estimated Total Contract Cost: | $8,784,622.00 |
Estimated Total Federal Participating Construction Cost: | $9,381,256.85 |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|