| Project Description: |
LEE- BRIDGE REPLACEMENT, L-05-002 (057), WILLOW STREET OVER HOUSATONIC RIVER
This project will consist of a full bridge replacement at the Willow Street bridge over the Housatonic River, in the town of Lee.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | William F Brown![]() |
| Estimated Total Contract Cost: | $12,298,620.00 |
| Estimated Total Federal Participating Construction Cost: | $12,634,291.25 |
| District: | District 1 |
| Current Status: | The Contract Scope of Work has been sent to the Design Engineer for consideration (as of 09/25/2024 ) |
|