Project Description: |
LEE- BRIDGE REPLACEMENT, L-05-002 (057), WILLOW STREET OVER HOUSATONIC RIVER
This project will consist of a full bridge replacement at the Willow Street bridge over the Housatonic River, in the town of Lee.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | William F Brown |
Estimated Total Contract Cost: | $12,298,620.00 |
Estimated Total Federal Participating Construction Cost: | $12,634,291.25 |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|