| Project Description: |
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR AND SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD)
ALL MOVABLE BRIDGES UNDER THE CONTROL OF DISTRIC 5 AND PUMP HOUSE LOCATED AT COPELAND DRIVE IN MANSFIELD
|
| Location: | |
| Construction Begins: | Winter 2024/2025 |
| Resident Engineer: | Louis daPonte![]() |
| Construction Bid Price: | $5,620,255.00 |
| District: | District 5 |
|
Bridges
|
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||