Project Description:
|
BURLINGTON- HAVERHILL- SCHEDULED BRIDGE MAINTENANCE REPAIRS ON B-29-006 (2G2 & 2G3) AND H-12-038 (2X0 & 2WY)
|
Location:
|
Town of Burlington
City of Haverhill
|
Design Responsibility:
|
In-House Boston |
Right of Way Responsibility:
|
MassDOT |
Construction Begins:
|
Autumn 2025 |
Project Manager:
|
Genesis Poz Diaz |
Estimated Total Contract Cost:
|
$4,000,850.00 |
Estimated Total Federal Participating Construction Cost:
|
N/A |
District:
|
District 4 |
Current Status:
|
This project is in the preliminary design phase. |