Project Description: |
PEABODY- BURLINGTON- SCHEDULED SUBSTRUCTURE REPAIRS ON P-03-023 AND B-29-009
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2025 |
Project Manager: | Genesis Poz Diaz |
Estimated Total Contract Cost: | $1,000,500.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|