WORCESTER- BRIDGE PRESERVATION, W-44-099 (214), MILLBROOK STREET OVER I-190 (SB) AND W-44-029 (23B) MILLBROOK STREET OVER RAILROAD
This contract includes the reconstruction of bridge joints, replacement of the existing bridge wearing surface, milling and repaving of the roadway and approaches, sidewalk repairs, addressing structural and safety concerns, and performing other related work. The project will include two (2) bridges located on Millbrook Street over the Railroad – Bridge No. W-44-029 (23B) and Millbrook Street over I-190 Southbound – Bridge No. W-44-099 (214) in Worcester. The work also includes setting up detours, coordinating, and implementing the Temporary Traffic Control Plan (TTCP) for each phase of work and milling of the pavement to a depth of 1 1/2” on the roadway between the bridges, the approaches, and extending to the limits specified in the drawings or as directed by the Engineer.
Location:
  • City of Worcester
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Genesis PozDiaz
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • W44029 
    • W44099 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project