Project Description: |
TEMPLETON TO LANCASTER- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 2
This project is for the replacement and upgrading of guide and traffic signs on Route 2 from the Route 68 interchange in Templeton easterly to the Jackson Road interchange in Lancaster, including applicable signs on secondary roads intersecting Route 2
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Stephen Timmins |
Estimated Total Contract Cost: | $2,691,000.00 |
Estimated Total Federal Participating Construction Cost: | $2,872,545.00 |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|