Project Description: |
LEOMINSTER- BRIDGE REHABILITATION, L-08-004, MECHANIC STREET OVER MONOOSNOC BROOK
The proposed improvements include replacing/repairing beam that supports the downstream sidewalk; resurfacing bridge roadway; reconstructing one or both sidewalks; installing guardrail and fencing; and repairing retaining walls.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Municipality |
Construction Begins: | Winter 2025/2026 |
Project Manager: | Ryan P. Wilcox![]() |
Estimated Total Federal Participating Construction Cost: | N/A |
Funding Provision: | This project is planned to be funded through the 2025 Transportation Improvement Program for the Montachusett Metropolitan Planning Organization. |
District: | District 3 |
Current Status: | PS&E Received (as of 08/19/2025 ) |
|