Project Description:
BOURNE- RAIL TRAIL CONSTRUCTION (PHASE 3)
The project proposes a shared-use path that is ADA compliant. The path will include paved sections as well as crossings of the Pocasset River and the inflow to Red Brook Pond. This project may utilize the existing right-of-way of the Falmouth Secondary rail line and connects to Phase 2 of the Bourne Rail Trail at Valley Bars Road and Phase 4 at Scraggy Neck Road, totaling approximately 11,200 linear feet in length. The project will identify connections to local trails and roadways. The design will evaluate and mitigate impacts to local wetlands and account for 100- year flood elevation in the design of culverts and waterway crossings.
Location:
  • Town of Bourne
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Stephanie Upson
    Estimated Total Contract Cost: $22,320,000.00
    Estimated Total Federal Participating Construction Cost: $23,409,200.00
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/16/2024
    Project Initiation Form PIF Entered 08/16/2024
    Project Initiation Form PRC Submitted 08/26/2024
    Project Review Committee PRC Approved 09/24/2024
    Project Management