SANDISFIELD- ROCK STABILIZATION ON ROUTE 8
As of Sept-2024, specific details of the construction work are under development with MassDOT Geotech Section, but the project scope will likely include a combination of rock/ledge removal and installation of a rock catchment/containment system along the west side of Route 8, within a one-mile segment of highway just north of the Connecticut line. This section of Route 8 has a history of rock-falls from an existing ledge face, posing a on-going threat to highway users.
Location:
  • Town of Sandisfield
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Koby J Lemrise
    Estimated Total Contract Cost: $13,900,000.00
    Estimated Total Federal Participating Construction Cost: $14,654,000.00
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/22/2024
    Project Initiation Form PIF Entered 08/22/2024
    Project Initiation Form PRC Submitted 08/30/2024
    Project Review Committee PRC Approved 10/02/2024
    Project Management