Project Description: |
SPRINGFIELD- CHICOPEE- REPLACEMENT & REHABILITATION OF HIGHWAY LIGHTING SYSTEMS ON I-91 (MM6.0-MM8.5)
The work in this project will consist of the removal and replacement of new lighting equipment including poles, luminaires, conduit, wires, and load centers. Guardrail will be replaced or added to meet current MassDOT standards, where necessary at each location.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Koby J Lemrise |
Estimated Total Contract Cost: | $21,027,501.80 |
Estimated Total Federal Participating Construction Cost: | $21,621,133.70 |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|