Project Description:
ACTON- RECONSTRUCTION OF ROUTE 2A/119 (GREAT ROAD), FROM DAVIS ROAD TO HARRIS STREET
The project proposes multi-modal "complete streets" improvements for all users along the corridor. A preliminary conceptual design that was developed as part of the initial complete streets study includes the opportunity for an accessible 10' shared use path on the northern side (with a 5' grass buffer) and an accessible 5' sidewalk on the southern side (with a 3' grass buffer). Additional high visibility crossings of Great Road are proposed to enhance access and connectivity between the rail trail, nearby residences, Veterans Memorial Park and local businesses. These are anticipated to receive proper countermeasures such as HAWK systems, where appropriate. The project will also include the evaluation of traffic operations and geometric improvements at the Great Road/Main Street intersection. The work is anticipated to address congestion and safety issues with the introduction of geometric modifications and traffic signal upgrades, or a roundabout. Minor intersection improvements at the intersections of Great Road/Meyer Hill Road and Great Road/Skyline Drive to enhance safety are also proposed. In addition, the project aims to introduce streetscape aesthetics, landscaping, stormwater best management practices (BMPs), and street lighting along the corridor.
Location:
  • Town of Acton
  • Design Responsibility: Municipality
    Project Manager: Douglas Johnson
    Estimated Total Contract Cost: $11,978,500.00
    Estimated Total Federal Participating Construction Cost: $12,847,235.00
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/28/2024
    Project Initiation Form PIF Entered 08/28/2024
    Project Initiation Form PRC Submitted 08/28/2024
    Project Review Committee PRC Approved 10/02/2024
    Project Management