Project Description:
AUBURN- WORCESTER- IMPROVEMENTS ON ROUTE 20 (WASHINGTON STREET), FROM 1000 FEET EAST OF COMMERCE DRIVE TO 1500 FEET EAST OF THE AUBURN-WORCESTER T.L.
The purpose of this project is to enhance safety, functionality, and connectivity on US Route 20 in Auburn and Worcester. This involves milling and overlaying the pavement, pavement widening, modifying pavement markings, and upgrading drainage features. The project will install a shared use path, sidewalk and improve bicycle and pedestrian facilities at driveways, access points, and intersections. These enhancements will promote healthy transportation options such as walking, bicycling, and public transit. This project complements the planned HAWK signal project at the eastern project limit and extends the Auburn Development Shared Use Path at teh western limit, creating a vital connection within the local network. Overall, these improvements will boost safety, accessibility, and sustainable transportation,benefiting the community's quality of life.
Location:
  • Town of Auburn
  • City of Worcester
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Alolade O Campbell
    Estimated Total Contract Cost: $5,884,500.00
    Estimated Total Federal Participating Construction Cost: $6,527,690.00
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/28/2024
    Project Initiation Form PIF Entered 08/28/2024
    Project Initiation Form PRC Submitted 08/28/2024
    Project Review Committee PRC Approved 10/02/2024
    Project Management