Project Description: |
GREAT BARRINGTON- RECONSTRUCTION OF PARK STREET (ROUTE 183)
The project includes roadway reconstruction, geometric improvements, construction of a shared
used path, pavement markings and signage improvements (including ADA compliant crosswalks and curb ramps), transit shelter access improvements, culvert and drainage improvements, utility pole relocation, replacing guardrail with MASH compliant systems, and embankment stabilization along the Housatonic River.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Project Manager: | Michael O'Dowd |
Estimated Total Contract Cost: | $26,315,000.00 |
Estimated Total Federal Participating Construction Cost: | $28,038,775.00 |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|