| Project Description: |
WESTFIELD - ROADWAY RECONSTRUCTION ON ROUTE 10/202 BETWEEN WESTFIELD INDUSTRIAL PARK ROAD AND LOCKHOUSE ROAD
Work consists of reconstructing the road on Route 10 and 202.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Anthony Christakis![]() |
| Estimated Total Contract Cost: | $19,390,000.00 |
| Estimated Total Federal Participating Construction Cost: | $20,800,150.00 |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||