Project Description:
DISTRICT 4- ACCESSIBILITY IMPROVEMENTS AT MULTIPLE LOCATIONS (SOUTHERN PROJECT)
The purpose of this project is to reconstruct and upgrade all deficient pedestrian curb ramps to full ADA compliance at three locations. Two of the locations are in Revere. The first location is at the intersection of Route 1A (North Shore Rd) and Oak Island Street. The second location is at the intersection of John Mooney Road and Beach Street. The third location is in Malden along Salem Street between Fairfield Avenue and Traverse Terrace. Additional curb ramps, sidewalk, crossings and crossing enhancements, curb extensions, and pedestrian signal upgrades will be evaluated on a location by location basis.
Location:
  • City of Malden
  • City of Revere
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Jonathan E Freeman
    Estimated Total Contract Cost: $1,036,750.00
    Estimated Total Federal Participating Construction Cost: $1,163,070.35
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/30/2024
    Project Initiation Form PIF Entered 08/30/2024
    Project Initiation Form PRC Submitted 08/30/2024
    Project Review Committee PRC Approved 10/02/2024
    Project Management