| Project Description: |
SANDISFIELD- BRIDGE REPLACEMENT, S-03-041, TOWN HILL ROAD OVER GILDER POND OUTFLOW
State-of-good-repair project limited to replacing deteriorated corrugated metal pipes with a more durable type of structure.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Stephen Soma![]() |
| Estimated Total Contract Cost: | $1,461,375.00 |
| Estimated Total Federal Participating Construction Cost: | $1,569,625.00 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||