Project Description: |
LAWRENCE- BRIDGE PRESERVATION, L-04-004 (2PX), UNION STREET OVER NORTH CANAL
This project will consist of bridge preservation work at the Mario Lucchesi bridge in the City of Lawrence. The bridge carries Union Street over the North Canal. The work will consist of repair or replacement of the existing sidewalks and railings. Additionally, the wearing surface will be removed and replaced with localized concrete patching of the deck and superstructure as needed.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2026 |
Project Manager: | Genesis Poz Diaz![]() |
Estimated Total Contract Cost: | $1,370,000.00 |
Estimated Total Federal Participating Construction Cost: | $1,465,400.00 |
Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Merrimack Valley Metropolitan Planning Organization. |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|