Project Description: |
BOSTON- TOBIN BRIDGE PAINTING AND MISCELLANEOUS STEEL REPAIRS ON B-16-017 (LITTLE MYSTIC)
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | John Fallon |
Estimated Total Contract Cost: | $92,000,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|