| Project Description: |
BOSTON- BRIDGE DECK PRESERVATION OF B-16-259 AND B-16-260 ON I-93
This project targets the I-93 viaduct in Dorchester. The project will include repair/replacement of bridge joints, full replacement of the wearing surfaces, concrete deck patching, bridge barrier and railing repairs, and all traffic control required to complete the project.
|
| Location: |
|
| Construction Begins: | Winter 2025/2026 |
| Resident Engineer: | Ammar A Alkhatatabih![]() |
| Construction Bid Price: | $16,699,051.25 |
| Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
| District: | District 6 |
|