Project Description: |
BOSTON- BRIDGE DECK PRESERVATION OF B-16-259 AND B-16-260 ON I-93
This project targets the I-93 viaduct in Dorchester. The project will include repair/replacement of bridge joints, full replacement of the wearing surfaces, concrete deck patching, bridge barrier and railing repairs, and all traffic control required to complete the project.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Alina Daragan![]() |
Estimated Total Contract Cost: | $21,353,296.50 |
Estimated Total Federal Participating Construction Cost: | $22,040,808.25 |
District: | District 6 |
Current Status: | 100% Package Received (as of 06/25/2025 ) |
|
Bridges
|
|
|
|