| Project Description: |
HUDSON- BIKE PATH CONSTRUCTION OF MASS CENTRAL RAIL TRAIL, FROM FELTON STREET TO PRIEST STREET
The project will construct a new 10' wide HMA trail on the existing rail bed that is currently controlled by DCR between Priest Street and Felton Street. A new bridge is proposed across Tower Street, while the existing timber railroad bridge over Bruce Pond is proposed to be rehabilitated.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Jonathan E Freeman![]() |
| Estimated Total Contract Cost: | $16,717,500.00 |
| Estimated Total Federal Participating Construction Cost: | $17,482,300.00 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||