| Project Description: |
SANDWICH- PARK AND RIDE FACILITY ON ROUTE 130 AT ROUTE 6 WITH SHARED USE PATH
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Thomas H Currier![]() |
| Estimated Total Contract Cost: | $7,346,604.50 |
| Estimated Total Federal Participating Construction Cost: | $7,688,705.28 |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||