| Project Description: |
PITTSFIELD- BRIDGE REPLACEMENT, P-10-022, DALTON AVE OVER ASHUWILLTICOOK BIKE TRAIL
This project will consist of a bridge replacement at the Dalton Ave bridge over the Ashuwillticook bike trail in the City of Pittsfield. May be a buried box bridge replacement.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | David Shedd![]() |
| Estimated Total Contract Cost: | $9,205,650.00 |
| Estimated Total Federal Participating Construction Cost: | $9,546,600.00 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||