| Project Description: |
DISTRICT 4- SOIL RESTORATION TO PROMOTE POLLINATOR HABITAT AND STORMWATER INFILTRATION
The scope of the project will be the modification of the existing compacted site soil through the addition of aggregate (sand and crushed stone,) along with organic amendment (compost) to provide a substrate for native grasses and forbs, resulting in a natural cover that improves soil infiltration and habitat, while maintaining a surface that is resilient to future use.
|
| Location: | |
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2027 |
| Project Manager: | Hung Pham![]() |
| Estimated Total Contract Cost: | $627,500.00 |
| Estimated Total Federal Participating Construction Cost: | $697,137.50 |
| Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the STATEWIDE. |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|