Project Description: |
DISTRICT 4- BICYCLE AND PEDESTRIAN IMPROVEMENTS AT VARIOUS LOCATIONS
The purpose of this project is to improve bicycle and pedestrian safety at 4 locations Lowell, Chelmsford, and Methuen. The work includes striped crossings, sidewalks and medians, signal upgrades, and ADA ramps.
|
Location: |
|
Right of Way Responsibility: | MassDOT |
Project Manager: | Koby J Lemrise![]() |
Estimated Total Contract Cost: | $8,680,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|