| Project Description: |
DISTRICT 4- BICYCLE AND PEDESTRIAN IMPROVEMENTS AT VARIOUS LOCATIONS
The purpose of this project is to improve bicycle and pedestrian safety at 4 locations Lowell, Chelmsford, and Methuen. The work includes striped crossings, sidewalks and medians, signal upgrades, and ADA ramps.
|
| Location: |
|
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $8,680,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|