| Project Description: | DISTRICT 4- BICYCLE AND PEDESTRIAN IMPROVEMENTS AT VARIOUS LOCATIONS The purpose of this project is to improve bicycle and pedestrian safety at 4 locations Lowell, Chelmsford, and Methuen. The work includes striped crossings, sidewalks and medians, signal upgrades, and ADA ramps. | 
| Location: |  | 
| Right of Way Responsibility: | MassDOT | 
| Project Manager: | Koby J Lemrise  | 
| Estimated Total Contract Cost: | $8,680,000.00 | 
| Estimated Total Federal Participating Construction Cost: | N/A | 
| District: | District 4 | 
| Current Status: | This project is in the preliminary design phase. | 
| 
 | Bridges | ||||||
| 
 | 
| 
 | 
| 
 
 
 | ||||||||||||||||||||