| Project Description: |
DISTRICT 5- BICYCLE AND PEDESTRIAN IMPROVEMENTS AT MULTIPLE LOCATIONS
The purpose of this project is to improve bicycle and pedestrian safety at 7 locations in Stoughton, Abington, Fairhaven, Fall River, Attleboro, and Hanover. The work includes improvements to sidewalks, ADA ramps, striping, and safe crossings.
|
| Location: |
|
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $8,252,580.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|