Project Description: |
DISTRICT 6- BICYCLE AND PEDESTRIAN IMPROVEMENTS AT MULTIPLE LOCATIONS
The purpose of this project is to provide biking and pedestrian improvements, ADA ramps, signage and safe crossings at three locations in Boston.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Koby J Lemrise |
Estimated Total Contract Cost: | $492,716.20 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|