Project Description: |
BOSTON- CAMBRIDGE- RIVERWALK BRIDGE CONSTRUCTION AT SCIENCE PARK
This project will construct a new shared use path connection on the west side of the Museum of Science, connecting the Boston and Cambridge sides of the Charles River, across a series of bridges and boardwalks.
|
Location: |
|
Design Responsibility: | Other |
Right of Way Responsibility: | Other |
Project Manager: | Lorenzo R Varone![]() |
Estimated Total Contract Cost: | $155,371,631.50 |
Estimated Total Federal Participating Construction Cost: | $166,278,720.50 |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|