Project Description: |
BLANDFORD- BRIDGE PRESERVATION, B-14-022, NORTH STREET OVER I-90
This project will consist of Bridge Preservation at the North Street bridge over Interstate 90, in the town of Blandford. The bridge preservation scope will include deck patching, joint repair, and substructure patching.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Alina Daragan![]() |
Estimated Total Contract Cost: | $4,200,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|