| Project Description: |
BOSTON- CANTON- MILTON- BRIDGE PAINTING AND MAINTENANCE OF 3 BRIDGES: B-16-272 (3FG), C-02-036 (35H, 35J) INCLUDING MULTIPLE RETAINING WALLS
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Autumn 2026 |
| Project Manager: | Alina Daragan![]() |
| Estimated Total Contract Cost: | $1,250,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||