Project Description:
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (AREAS A, B & C)
This project consists of maintenance resurfacing and roadway repairs at various locations throughout District 5 in Areas A, B and C. The work to be done includes pavement milling and/or the placement of Superpave hot mix asphalt, or a combination of these items as directed on various State-owned roadways. Other work to be done includes installing new ADA compliant wheelchair ramps, adjusting and rebuilding drainage, sanitary, and water structures, removing and resetting drainage structure frame and grates or covers, removing and resetting granite curbs, installing rumble strips at shoulders on high volume, multilane roadways, installing wire loops as required, installing new pavement markings, erosion controls, and other miscellaneous work.
Location:
  • City of Attleboro
  • Town of Mattapoisett
  • Town of Norton
  • Town of Norwood
  • City of Taunton
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Construction Begins: Spring 2026
    Project Manager: Andre Breneville
    Estimated Total Contract Cost: $4,460,000.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/29/2025
    Project Initiation Form PIF Entered 05/29/2025
    Project Initiation Form PRC Submitted 06/07/2025
    Project Review Committee PRC Approved 06/09/2025
    Project Management