| Project Description: |
DISTRICT 5- SCHEDULED AND EMERGENCY TREE TRIMMING, REMOVAL AND SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS (AREA D)
The work under this contract will consist of removing, trimming, or shaping roadside growth: to
eliminate trees and branches that are considered hazardous to the traveling public; to re-establish
design sight distance; to re-establish safety recovery zones; and to clear overgrowth for sign
visibility in Area D.
|
| Location: | |
| Construction Begins: | Spring 2026 |
| Resident Engineer: | Gabriel Rodrigues![]() |
| Construction Bid Price: | $1,210,695.00 |
| District: | District 5 |
|