| Project Description: |
DISTRICT 5- SCHEDULED AND EMERGENCY TRAFFIC SIGNAL REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS
The work under this contract consists of supplying, constructing, and installing traffic signal
related items at various signalized locations as directed by the Engineer. Ancillary items of work
such as wheelchair ramp construction, curb resetting, sidewalk replacement, pavement patching
and resurfacing may also be included.
|
| Location: | |
| Construction Begins: | Spring 2026 |
| Resident Engineer: | Shawn Morris![]() |
| Construction Bid Price: | $1,448,378.00 |
| District: | District 5 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||