| Project Description: |
DISTRICT 3- SCHEDULED AND EMERGENCY STRUCTURAL AND SUBSTRUCTURE AND RELATED REPAIRS AT VARIOUS LOCATIONS
The work under this contract shall include scheduled and emergency substructure and structural repairs at various locations throughout the district, as needed and as directed by the Engineer.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Winter 2026/2027 |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Contract Cost: | $2,529,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 10/10/2026 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||||||||||||||||||||