| Project Description: |
AMESBURY- SCHEDULED BRIDGE MAINTENANCE REPAIRS ON A-07-014 AND A-07-016
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Genesis Poz Diaz![]() |
| Estimated Total Contract Cost: | $1,995,250.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||