| Project Description: |
DISTRICT 4- BRIDGE RESURFACING AT VARIOUS LOCATIONS
Bridge resurfacing at various locations.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2026 |
| Project Manager: | Dylan Brown![]() |
| Estimated Total Contract Cost: | $3,000,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 05/02/2026 ) |
|