| Project Description: |
DISTRICT 3- ELASTOMERIC PROTECTIVE COATING APPLICATION TO CONCRETE SURFACES AND RELATED WORK
The scope of work includes the installation of protective concrete coatings on bridges and walls at various locations within District 3.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Mohammed Nabulsi![]() |
| Estimated Total Contract Cost: | $1,104,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|