| Project Description: |
WOBURN- BRIDGE FENCE INSTALLATION ON W-43-047 AND W-43-048
Installation of a suicide prevention fence on the existing bridge barrier.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Genesis Poz Diaz![]() |
| Estimated Total Contract Cost: | $1,999,850.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|