| Project Description: |
SHERBORN- RECONSTRUCTION OF ROUTE 27 AND ROUTE 16 (DESIGN ONLY)
The Boston MPO is providing TIP funds for an alternative analysis and preliminary design, to identify the preferred improvements for intersections and Bike/Ped accessibility along the corridor. The goal is to incorporate improvements while maintaining the rural/village sense and feel of the area.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Muazzez G Reardon![]() |
| Estimated Total Contract Cost: | $27,700,000.00 |
| Estimated Total Federal Participating Construction Cost: | $29,514,500.00 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||